I Need More Information
Pool Transparent
ISONEM POOL TRANSPARENT
(Transparent Pool Paint)
ISONEM Pool Transparent is a two-component, modified polyurethane resin-based, transparent pool paint designed to waterproof ceramic, tile, glass mosaic-coated surfaces with insulation problems. Ceramic, tile, glass mosaic, tile, etc. can be used to solve the insulation problems of existing pools. The product, which provides waterproofing in an extremely easy and economical way without the need to remove the coatings, gives the surface a bright appearance as well as excellent insulation on the surface it is applied. It is hard-elastic, does not crack, does not swell, does not lift. It is not affected by UV rays and pool chemicals. It is extremely resistant to alkali and chlorine. It does not turn yellow, does not deteriorate under water, does not corrode. It is extremely easy and economical to work.
Technical Specifications
Density A comp. (25°C, g/mL):0,93 ± 0,10
pH (25°C):Not applicable (N/A)
Viscosity A comp. (25°C, mPa.s):Not applicable (N/A)
Solid content (% Weight):30 ± 2
Water transmission rate (kg/ m2. h0,5):< 0,1 CLASS W3
Adhesion strength by pull-off test (N/mm2):Rigid system without trafficking ≥ 1.0 N/mm²
Permeability to water vapour (m):SD ≤ 5 CLASS I
Touch-free Drying:6 hours
Through-dry time:10 days
Pot life (23°C):5 – 6 hours
Solvent:Organic solvent
Class of fire reaction:B fl S1
Color:Transparent
Usage Areas
– Ceramic, tile, glass mosaic, tile, etc. covered swimming pools,
– In ornamental pools,
– Hammam, sauna, etc. in places,
Application Procedure
Surface preparation: The surface must be clean, dry and free of foreign materials such as dirt, oil, coating, surface curing materials. After the water of the existing pools in use is drained, at least 7 days should be waited before the application in order to ensure that the joints are completely dry. If the existing joint fillers are worn, the necessary repairs and renewals must be made with cement-based joint fillers and full curing should be expected. Primer should be applied to the pre-prepared application surface before ISONEM POOL TRANSPARENT application, and ISONEM Liquid Glass product should be used in a single layer with a consumption of 75 – 150 g/m2 in the primer application. 4 hours after the primer application, ISONEM POOL TRANSPARENT, which is the last layer, should be applied.
Preparation of the mixing: Before preparing the mixture, mix component A until it becomes homogeneous in itself. After adding component B to component A, mix for 3-4 minutes until a homogeneous mixture is obtained.
Application method: The application should be done in one coat, with a brush, roller or a suitable sprayer. The prepared mixture should be consumed within 5-6 hours. After the application, the pool should be left to cure for 10 days before being filled with water.
Things to consider during and after the application: The application surface must be clean and free of substances such as dirt, oil, mud. If the existing joint fillers are worn before the application, they should be renewed. 4 hours after the primer application, the top coat should be applied. After the water discharge of the pools in use, it should be waited for at least 7 days for complete drying. Application should not be made on joints that are not fully cured.
Other ISONEM products recommended: In primer application, ISONEM Liquid Glass should be used.
Application Conditions / Limitations
Application:In the same direction as the first coat of primer
Surface humidity:Must be dry
Primer usage:ISONEM Liquid Glass
Primer consumption:75 – 100 g/m²
Product usage:1 layer
Product consumption:100 – 200 g/m²
Paintable (Coverage) Area:22,5 – 45 m² /set
Between two coats:4 hours (Between primer and topcoat application)
Recommended application tools:Roller (synthetic epoxy), brush, suitable spray
Application temperature (°C):5 – 35 °C
Application Conditions / Limitations
Application:In the same direction as the first coat of primer
Surface humidity:Must be dry
Primer usage:ISONEM Liquid Glass
Primer consumption:75 – 100 g/m²
Product usage:1 layer
Product consumption:100 – 200 g/m²
Paintable (Coverage) Area:22,5 – 45 m² /set
Between two coats:4 hours (Between primer and topcoat application)
Recommended application tools:Roller (synthetic epoxy), brush, suitable spray
Application temperature (°C):5 – 35 °C